Define the six-assessment deliverable
The finished object is not a pretty study schedule. It is a six-row submission contract that keeps date, local time, time zone, channel, format, filename rule, attempt limit, and dependency together. The fictional BIO-241 fixture deliberately spans CDT and CST, an in-person notebook check, one online quiz window, paired work, and a final two-file upload so the method has meaningful failure modes.
For calendar serialization, RFC 5545 defines iCalendar date-time and time-zone fields. It cannot establish the correct deadline; the syllabus and authorized course records must supply that.
Course-planning vocabulary used below
| Term | Meaning in this tutorial |
|---|---|
| Authoritative clock | The source named by the course—in this fixture, LMS timestamps rather than a personal calendar. |
| Atomic assessment row | One graded task with one stable source ID and all submission constraints kept together. |
| Review-only export | An ICS file prepared for inspection but not imported into a calendar. |
| Release ceiling | The furthest state the evidence supports: READY_FOR_STUDENT_REVIEW, never submitted. |
Four ways a student plan can betray its syllabus
| Course defect | Unsafe draft evidence | Student consequence |
|---|---|---|
| Moved date | A-01 changed from September 8 to September 9 | A reminder at the wrong time is worse than no reminder. |
| Invented channel | The physical notebook check became an LMS upload | The student could complete work correctly and still fail to present it. |
| Format substitution | The DOCX memo became a PDF | A readable file can still violate the assignment contract. |
| Omission | The quiz and CSV appendix disappeared | A summary that looks complete can hide an entire graded event or file. |
Step 1: freeze the syllabus boundary
Source preparation. Place the current syllabus and assignment briefs in one folder. Record the course time zone and the statement that defines which clock wins. Do not combine an old calendar, a class group chat, and the current LMS without labelling their authority.
Inventory every supplied file. Return the course identifier, stated timezone, authoritative timestamp source, assessment IDs, and conflicts. Do not extract a plan yet. Mark any version or authority question UNRESOLVED.Evidence retained. The retained preflight found six assessments, one America/Chicago boundary, and no stated blanket grace period. It also preserved the switch from CDT to CST rather than flattening every deadline into a fixed offset.

Stop condition. Confirm that the syllabus is current and that each brief belongs to the same course run. If the instructor has changed a date in the LMS, update the source packet before proceeding.
Step 2: atomize each assessment
Structuring decision. Give every assessment a stable ID. Put required components, upload or presentation evidence, and dependencies in separate fields. A paragraph such as “final report plus data appendix” must become two required-file facts, not one general task label.
For each A-## source, return assignment, required components, channel, accepted format, filename or file-count rule, attempt rule, dependency, and source locator. Use NOT_STATED rather than inference.Structured result. A-01 through A-06 became distinct rows. The quiz retained both open and close times; the notebook retained its at-start-of-lab condition; the final report retained PDF plus CSV as two files.

Integrity check. Read every source once beside the ledger. Pay special attention to conjunctions such as plus, and, before, after, one attempt, and one submission per pair.
Step 3: write a release contract before drafting
Release contract. State what the AI may transform and what it may not decide. Include exact time zones, uncertainty labels, a no-import condition, and the required terminal state. This prevents a helpful model from silently normalizing inconvenient rules.
Create one assessment row only when a source ID exists. Preserve exact dates, local times, timezone, channel, file format, count, and constraint. Return exceptions separately. End at READY_FOR_STUDENT_REVIEW; do not import, submit, or contact anyone.Contract outcome. The contract made source fidelity more important than calendar neatness. It also separated a review artifact from any live calendar or LMS action.

Boundary check. Remove any instruction that asks the model to make the schedule ‘reasonable’ or ‘complete.’ Those words invite substitution when the source is awkward or silent.
Step 4: retain the first AI draft
First-pass test. Save V1 unchanged. Do not repair errors while copying it into the audit. The first result is needed to show where fluent transformation failed and whether the review rules can catch the failure.
Using the frozen sources and contract, draft the checklist. Return source_id, due, channel, format, constraint, and exception.Observed failure. The deliberately unsafe V1 had only one faithful row out of five shown. It moved A-01 by a day, invented an upload and late time for A-03, changed A-04 to PDF, and omitted A-05 plus the CSV appendix from A-06.

Failure check. Count source IDs before reading prose. Missing IDs, duplicate IDs, and an unexpected number of rows are immediate blockers.
Step 5: audit dates and submission channels independently
Evidence audit. Compare one field at a time rather than judging each row as a whole. A correct title must not hide a wrong date; a correct date must not excuse a wrong format. Record the smallest repair needed.
Compare V1 to each cited source field. Return PASS or BLOCKED for date, time, timezone, channel, format, file count, attempt rule, and dependency. Quote the conflicting source phrase and propose only the minimum correction.Audit finding. The audit identified four consequential patterns instead of merely saying the draft needed edits. This made the correction ledger reviewable by a student who did not trust the initial extraction.

Source check. If an exact source phrase is unavailable, leave the field unresolved. Do not accept a model’s explanation as a substitute for the course document.
Step 6: build the verified workbook
Corrected deliverable. Apply approved corrections to a new sheet while retaining source briefs and the blocked V1 on separate tabs. Each contract formula compares the final row with every retained field; human review still owns source interpretation.
Patch only the blocked fields. Restore every A-01 through A-06 row. Keep the source ID, America/Chicago timezone, no-upload notebook rule, DOCX memo, one-attempt quiz, and PDF + CSV final requirement.Corrected result. All six rows passed exact field-by-field workbook formulas. The checklist preserved both daylight and standard-time dates through the named time zone and marked every row READY_FOR_STUDENT_REVIEW.
Artifact check. Open every sheet, scan for clipped requirements, and verify the row count and source sequence. A formula PASS proves equality to this frozen fixture, not that the live course record is unchanged.
Step 7: export a calendar file without importing it
Export review. Create VTODO entries whose DUE values match the verified rows. Put the source ID and a reminder to recheck the LMS in each description. Treat the file as a candidate, not a live schedule.
Produce RFC 5545 VTODO entries from the verified rows. Include a VTIMEZONE definition for America/Chicago, stable synthetic UIDs, DUE, SUMMARY, and a source-check DESCRIPTION. Do not claim import success.Export evidence. The retained ICS contains six review tasks plus explicit daylight and standard-time VTIMEZONE rules for America/Chicago. No calendar application was opened, so client-specific import behavior remains unverified.

Portability check. Inspect the text file, then test a disposable copy in the calendar product you actually use. Confirm due times across the daylight-to-standard transition, reminders, and duplicates before trusting it.
Step 8: run the student-release gate
Release decision. Execute the checker against the corrected CSV and its negative mutations. The gate must confirm all source IDs and reject the known wrong date, invented grace period, memo format change, and quiz omission.
python3 course-checklist-evidence-gate.pyGate result. The gate returned PASS for the six-row inventory, quiz presence, physical notebook channel, final two-file rule, time zone, and review state. All four mutations were rejected; calendar import and LMS submission remained false.

Owner check. Before a real deadline, compare the row with the live LMS again. This fixture proves internal consistency, not that an instructor has made no later change.
Boundaries around the deadline fixture
This test uses invented course materials. It does not validate a school policy, accommodation, academic-integrity rule, LMS import, reminder delivery, or instructor change. Never upload private student records or graded work to an unapproved service. The student remains responsible for reading the assignment and verifying the live submission screen.
When the checklist is ready to use
- Every assessment has one source ID and an exact match for date, local time, time zone, channel, format, and constraint.
- The rejected extraction, repaired workbook, VTIMEZONE calendar text, mutation replay, and non-submission state remain available for inspection.
- Unknown policy, accommodation, reminder-delivery, and outcome questions remain outside the file instead of being guessed.
- The student confirms the current LMS record immediately before relying on a row.
